Identifiers such as PG-01 and DI-02 label records or rules inside the linked lesson, lab and combined campus pack. Each supplied-rule section explains that mapping. They are not extra downloads to find. Blank grids, timelines and record sheets are included in the packs or described as records you create yourself.
WEEK 01 / Perception Gallery
Read the Room
Distinguish visible facts, reported claims and explanations, then choose an inspection that tests a proposed explanation.
- PG-01: arrival-room inventory
- PG-02: altered scene record
- Blank observation grid
Mission application: A1 uses this method to choose which workshop condition needs investigation. The final project uses it to keep an arrival impression from becoming an unsupported operating assumption.
WEEK 02 / Perception Gallery
Build a Memory Palace
Compare unaided recall, location cues and written notes, then choose a retrieval strategy appropriate to the task.
- MP-01: four-place academy route
- MP-02: practice and transfer lists
- Recall comparison sheet
Mission application: Memory is optional support in A1 and handoffs. The final project does not require recall when an accurate external record serves the objective better.
WEEK 03 / Spatial Lab
Think in Three Dimensions
Reconcile a fixed diagram with a differently oriented scene, predict its transformation, then verify direction and height independently.
- SP-01: labelled L-connector
- SP-02: changed orientation and level
- Coordinate and transformation sheet
Mission application: A1 relates an unfamiliar workshop diagram to its connector. A physical final recovery may need this capability; a digital operation need not invent a transport problem.
WEEK 04 / Mechanics Workshop
Understand the Mechanism
Distinguish mechanism faults using selected inspections, predict motion and verify a targeted repair.
- ME-01: training carriage mechanism
- ME-02: changed output and cam requirements
- Causal diagram sheet
Mission application: A1 combines mechanism diagnosis with observation and spatial modelling. Physical recovery and stabilisation can need a support mechanism; digital recovery need not repeat an unrelated cradle exercise.
WEEK 05 / Systems Garage
Wake a Dead System
Choose circuit measurements that distinguish faults, repair what the evidence supports and verify the powered result.
- EL-01: 6 V lamp circuit
- EL-02: fault observation sheet
- Measurement record
Mission application: A2 requires a diagnosis another role can use. Final power checks support transmission or continuous support, and transport only when the selected route depends on power.
WEEK 06 / Digital Observatory
Follow the Digital Trace
Resolve conflicting records by separating authority, integrity and completeness while preserving a decision timeline.
- DI-01: three archive-copy records
- DI-02: signed reference and amendment
- Timeline worksheet
Mission application: A2 uses this record to justify instructions to another role. Every final approach needs source evidence, but matching a digest does not itself choose the recovery objective.
WEEK 07 / Digital Observatory
Challenge the System
Translate authority into testable permissions, diagnose deviations and preserve policy versions when requirements change.
- CY-01: fictional role policy
- CY-02: test matrix and faulty rule
- Before/after permission audit
Mission application: A2 needs legitimate relay access. The digital final approach uses the appropriate local policy; physical handover does not gain an arbitrary software gate.
WEEK 08 / Council Studio
Get the Message Through
Coordinate across unequal information using questions, read-back and renewed confirmation when an instruction changes.
- CO-01: analyst role pack
- CO-02: operator role pack
- Handoff and agreement record
Mission application: A2 assesses a real handoff between partners. The final team uses this method when source findings, equipment conditions or responsibilities change another person's work.
WEEK 09 / Council Studio
Play the Part
Negotiate legitimate responsibilities using verified records, multiple feasible proposals and explicit costs and obligations.
- RP-01: Neri, Pell and Sen role briefs
- RP-02: comparison, mandate and capacity records
- Agreement worksheet
Mission application: The final team must defend a recovery objective and agree custody and monitoring obligations. This lab practises the judgement behind that agreement.
WEEK 10 / Movement Hall
Move Through the Model
Choose a route for an explicit objective, predict its published sensor events and compare its dependencies with an alternative.
- SN-01: grid and sensor contract
- SN-02: changed sensor condition
- Route prediction sheet
Mission application: A physical final recovery needs a route suited to its load and equipment. Digital and stabilisation approaches need relevant evidence rather than compulsory token navigation.
WEEK 11 / Operations Studio
When the Plan Breaks
Identify dependencies invalidated by disruption, retain supported decisions and rehearse a revision without overwriting the original.
- IM-01: baseline recovery rehearsal
- IM-02: equipment and evidence disruption cards
- Version comparison sheet
Mission application: The final project needs a reasoned change between contrasting rehearsals. Explain why its chosen objective remains feasible or why the team deliberately revises it.
WEEK 12 / Meridian Station
Recover the Impossible
Select relevant capabilities for a recovery objective, coordinate their dependencies and defend the result and remaining obligations.
- MR-01: Meridian mission charter
- MR-02: resolution requirements
- Mission debrief and contribution record
Mission application: This lab assembles the final-project evidence. The after-action account does not replace the performed mission or the assessment's individual and team deliverables.