Skip to main content

Week 11 Tutorial: Where the nitrogen goes, and choosing between the options

Week 11 tutorial — size excreta and greywater to your site's band, find a destination for the nitrogen surplus, then build the options grid Assignment 2 turns on

20 May 2027

Time
90 minutes in the room, plus about 30 to tidy the output
Graded
Checkpoint 10 of 10, 2 % — a good-faith attempt at the output below
Due
5 pm, 21 May 2027

What this tutorial is for

Two halves. First the nitrogen, which is the constraint that caps every site. Then the comparison itself — the grid that Assignment 2’s recommendation comes out of.

Story stage. Design, second last week. This is the last graded checkpoint.

Open these first

If you missed week 10

You need a planted area and a rough nutrient input. Use PRACTICE — Wattle Street: 120 m² planted, receiving 4 kg of nitrogen a year from compost. Invented round numbers for teaching.

The words this week uses

Do this — part one, nitrogen (45 minutes)

1. Size the chamber. Storage band from your site’s annual mean, then capacity. Canberra and Adelaide students will find they need roughly 75 % more volume than the warm sites for the same four people, which is worth sitting with.

2. Then the nitrogen. Absorbable N against the household’s 13.6 kg a year. Everybody’s surplus is large. The activity is deciding where it goes — extended storage, alkaline treatment, export to a larger area, or reduced recovery in the first place — and costing that decision.

3. Then the citation exercise, which is the point of the session. Find your jurisdiction’s greywater instrument. Read what it actually requires. Write two sentences: what the law says, and where this course is stricter. Four of the five sites will find the course rule is not their law.

Do this — part two, the options grid (45 minutes)

4. Write the existing condition down first. From your findings page: what the home currently uses, imports and wastes. Every option is compared against this, and “do nothing” is a legitimate baseline that sometimes wins on one axis.

5. Build three options. Coherent packages, not shopping lists, and all three actually buildable on your site. One should be noticeably cheaper than the others — that is usually the interesting one.

measureexistingoption Aoption Boption C
cost, $ incl. 10 % contingency0
peak-month energy, kWh/day
water closure / garden water satisfaction
client targets met
maintenance, h/week

6. Mark the dominated options. An option worse on every row than another is struck out, with a line through it and one sentence of reason. Then identify the cheapest option that meets your client’s stated targets. Anything more expensive than that has to justify itself in Assignment 2, and this grid is where you find out what it would have to justify.

7. Say what you are declining. If mushrooms, insects or aquaponics do not earn their place on your site, write the sentence now, with the number behind it. That is a result, not a gap.

The output

A nitrogen balance with a destination for the surplus, a cited greywater instrument, and an options grid with the dominated options marked and the cheapest feasible option identified.

Check your own before you submit

  1. Does your chamber capacity match your site’s band, and can you say why the band differs?
  2. Does the nitrogen balance show absorbed and surplus separately, with the surplus going somewhere?
  3. Have you cited an actual instrument, and said where the course rule is stricter?
  4. Does the grid include the existing condition as a column?
  5. Are all three options buildable on your site, and is one of them clearly cheaper?
  6. Are dominated options marked, each with a one-sentence reason?
  7. Is the cheapest option that meets the client’s targets identified?

Where it goes next

Week 12 assembles everything, runs the five whole-system checks, and finds out which subsystem gives way first.

The spec

What earns the checkpoint. Every line is written so you can tell whether you have met it without asking anyone.

Teaching team

Back to week 11 overview