Week 11: The nitrogen has nowhere to go

Week 11 — sizing excreta and greywater systems, the uptake limit that caps every site, and the greywater rule that is the law in a state none of you is in

17 May 2027

Open slides — week 11

The question

The household excretes 13.6 kg of nitrogen a year, about 88 % of it in urine. A garden can take up roughly 12 g of nitrogen per m² per year before the surplus becomes a pollution problem rather than a fertility one.

Multiply those out for your site. What do you do with the rest?

The method: an uptake-limited nitrogen balance

Absorbable N = production area (m²) × 0.012 kg N/m²/yr

Against 13.6 kg, no site in this course absorbs even half.

SiteGrowing areaAbsorbable NShare of household N
Darwin500 m²6.0 kg44 %
Canberra450 m²5.4 kg40 %
Alice Springs400 m²4.8 kg35 %
Adelaide250 m²3.0 kg22 %
Brisbane130 m²1.6 kg11 %

So between 56 % and 89 % of your household’s nitrogen has to go somewhere that is not your garden. That is a design problem, not a design failure, and a proposal that quietly applies all 13.6 kg to the beds will be marked down for the arithmetic, not the ambition.

Storage, and why Canberra pays for being cold

WHO’s guidance on the safe use of excreta, Table 4.5, dry excreta with no new material added:

Ambient temperatureStorage time
2–20 °C1.5–2 years
Above 20–35 °COver 1 year
Alkaline treatmentpH above 9 for over 6 months

Canberra’s annual mean is 13.1 °C and Adelaide’s is 17.0 °C, so both sit in the 1.5–2 year band. Alice Springs, Brisbane and Darwin are above 20 °C and need one year. Canberra therefore needs about 75 % more chamber capacity than Darwin for the same household — a climate-driven sizing burden with nothing to do with how well the design is thought out. It is built into the reference designs, so the bands already absorb it.

Urine, WHO Table 4.6: at 20 °C, one month’s storage for crops that will be processed, six months for all crops.

And the scope the draft of this course originally missed. Immediately above that table, WHO writes: “For individual one family system and when the urine is used solely for fertilization on individual plots, no storage is needed.” A one-month withholding period before harvest applies to vegetables, fruit and root crops eaten raw. So the course’s storage requirement is deliberately more conservative than WHO’s own household position, and you should know that, rather than believing you are meeting a requirement.

Greywater: a rule that is the law somewhere none of you lives

Ask anyone who has looked into greywater and you will hear the same three rules. Untreated greywater goes subsurface, at least 100 mm down. It is never stored. It never includes kitchen water.

That is New South Wales law. None of this course’s five sites is in New South Wales.

Requirement for untreated greywaterACTNTQueenslandSouth Australia
Subsurface mandatoryNo — surface and bucket diversion contemplatedYes, “below the surface of the ground”No — the Code covers “subsurface or surface irrigation”Yes, “a subsurface land disposal system”
A depth figure in the instrumentOnly for treated greywaterDefinitional only (100–150 mm), not stated as the device criterionNoneNone in the Code
Kitchen water excluded“Not recommended”ProhibitedIncluded in the legal definitionGenerally excluded unless treated
Storage≤24 h, as guidance≤24 h—≤24 h
WaterMark device—Not requiredRequiredRequired
InstrumentGuidance only, no greywater-specific regulationPrescribed codeCode plus local approvalRegulation plus code

The course design rule is the strictest column: subsurface at 100 mm or more, no storage, no kitchen water. Every design follows it. But you must also state what your own jurisdiction actually requires, and where the course is stricter, say so.

The point is not that regulation is inconsistent, though it is. The point is that a designer who cannot tell a remembered rule from a cited one will eventually apply the wrong jurisdiction’s rule to a real site and be confident while doing it.

Two Australian standards that carry relevant depth and plumbing requirements are paywalled and were not read for this course. No depth figure anywhere on this site is sourced to them.

Five sites

SiteExcreta storageGreywater instrumentThe hard part
Canberra1.75 yearsACT: guidance only, no regulationCold storage burden and the least regulatory guidance to design against
Adelaide1.75 yearsSA: regulation plus codeSame storage burden; 22 % uptake means most N leaves
Brisbane1.0 yearQLD: code plus council approval11 % uptake. Nine-tenths of the nitrogen has to leave a 300 m² townhouse block
Alice Springs1.0 yearNT: prescribed codeDry soils and 35 % uptake; subsurface irrigation in sand behaves differently
Darwin1.0 yearNT: prescribed codeWet-season saturation makes subsurface disposal fail exactly when there is most of it

What this week hands you

A sanitation system sized to your site’s storage band, a greywater scheme that meets the course rule with your own jurisdiction’s requirement stated beside it, and a nitrogen disposal plan for the majority of your household’s nitrogen that the garden cannot take.