Week 12: What fails first

Week 12 — assembling the whole household model, testing it against the two hard constraints and a dry year, and naming the failure you cannot design away

24 May 2027

Open slides — week 12

The question

Eleven weeks have each produced a sized subsystem. Put them in one model, run the year, and find out which one gives way first.

Almost every design fails somewhere the student did not expect, because the subsystems compete for three shared resources — water, area and the daily energy allowance — and each week sized its piece as though it had first call.

The method: one balance, five checks

Assemble every week’s output into a single annual model, then run five checks in this order.

1. Do the mass balances close? Water in equals water used plus overflow plus loss. Dry matter in equals dry matter out plus a stated respiration term. Nitrogen in equals nitrogen applied plus nitrogen stored plus nitrogen exported. A stream that appears in no balance has been forgotten.

2. Does the energy fit? Peak-month average daily load, with the month named, every counted load listed with its power and duty cycle, and uncertain loads at their upper estimate. The reference designs declare 0.65 kWh/day of uncertain load on top of what the model computes, and land between 2.18 and 4.01 kWh/day against the 5 kWh/day cap. If you added a mushroom chamber, a controlled fermentation space, a dehydrator and a heated digester, their combined upper estimate is about 1.65 kWh/day — more headroom than some sites have left.

3. Does the budget fit? Every line from the published schedule, plus the required 10 % contingency. The excellent reference designs cost $24,860 to $28,875. At Darwin that leaves $1,125 of a $30,000 allowance, which is inside the noise of a screening model priced from retail listings. Treat a design that lands within a few thousand dollars of the cap as untested, not as compliant.

4. Do the indicators pair? Water closure is never reported without garden water satisfaction. Alice Springs’ excellent reference design reaches 97 % water closure with 16 % garden water satisfaction, and a design that shows only the first number is hiding the second.

5. What happens in a dry year? Re-run against the synthetic dry-year dataset and name what fails first.

What the five sites teach together

SiteBinding constraintThe number that tells you
CanberraSeason length and cold92 frost days; 1.75-year excreta storage; larvae thermally productive 19 % of the year
Alice SpringsWater, absolutely1,650 mm/yr of irrigation demand per m²; 97 % water closure achieved by watering 16 % of the deficit
BrisbaneArea and proximity130 m² of growing space; 11 % nitrogen uptake; strata rules no indicator scores
AdelaidePhase, not volumeRain in winter, demand in summer; 61 kL imported and nothing overflowing
DarwinTiming, not volume411 kL collected, 245 kL overflowed, 48 kL imported, in the same year

Five different answers to the same brief. None of them closes the loop.

The honest summary

At the excellent reference design, across all five sites:

A course that concluded otherwise would be selling something. What these designs demonstrate is not self-sufficiency; it is how far a well-reasoned design gets, and exactly where it stops — which is the more useful thing to be able to calculate.

The boundary, and what lies past it

Every figure above excludes energy and shelter. Your digester’s biogas was recorded and not credited. Your house’s heating, cooling, lighting, cooking, hot water and fridge were never in the counted-load list at all — and a four-person household uses about 21 kWh a day in total, against the 5 kWh/day this course governs.

So the loop you have modelled sits inside a much larger one you have not touched. That larger loop is SLOP4762 — Designing the Closed-Loop Household II: Energy and Shelter, a proposed follow-on course which would add energy physics and introductory thermodynamics to the prerequisites, and which would let the biogas, the thermal mass and the roof area you have already committed start earning their keep.

Design part one so that part two is still possible. A roof entirely given to catchment has nowhere left for collectors.

What this week hands you

The proposal skeleton: assembled model, five checks run, failure modes named, and an explicit list of what you did not model and what you were not sure about. The uncertainty list is marked. Leaving it short does not make it shorter.