Skip to main content
A miniature district projected on a lecture screen above rows of seated students.

Week 2: The Grid vs. the Organic Street

Hippodamus's grid, the medieval street and the Radburn superblock — three answers to the same question about what shape a block should be, and what each one does to a walk.

1 March 2027

Open the slides

The argument

The dimension of a block is not a drawing preference but a network decision: it sets how many routes exist between any two points and how many kilometres of road the district pays upkeep on every month, and those two numbers move in opposite directions.

What you will learn

Theory into practice

The deck walks through where each of these lands, slide by slide, against the studio’s own network.

Simulation mapping

Theory moveCities: Skylines II mechanicWhat students should watch happen
Hippodamian equal divisionThe road tool’s grid mode and its snapping incrementsThe block dimension chosen once at the start propagates across the whole quarter, because the tool makes repeating it cheaper than varying it
Jacobs on short blocksZoning cell depth against road frontageShort blocks put almost every cell on a frontage; long blocks leave a dead core the zoning tool cannot reach
Radburn’s superblock and cul-de-sacRoad hierarchy — small road, medium road, large road, highway — and the traffic AI’s pathfinding costEvery trip from a cul-de-sac is forced onto one collector, and the collector’s mouth is where the queue forms
Alexander’s tree versus semilatticeFollowing a single citizen’s chosen path, and the lane-selection behaviour approaching a junctionIn a tree there is one path and the vehicle takes it; in a semilattice the same origin and destination produce different paths at different hours
Space syntax integrationPaper path counts on the unzoned street graphCount alternative paths between fixed endpoints; this is a network measure, not observed traffic
Network costRoad upkeep in the economy panel, charged by lengthTwo layouts housing the same population differ in the monthly upkeep line, and the difference is permanent

Evidence standard. Named interface fields are direct readouts. Calculations shown from those fields are derived measures. Every fixed scenario value on this page is a worked hypothetical, not a captured run. See resources and evidence for access arrangements and worksheets.

The decision this week

Mobility performance against fiscal performance, forced by the block dimension chosen for the first residential quarter on Halstead Reach: a fine grid’s route redundancy against a superblock’s cheaper road upkeep. The deck works the spacing and cost figures for both. Students choose a dimension this week, and Week 6’s peak-load stress test is run against whatever they chose.

Into the studio

Bring the untouched Week 1 archive on Monday. Build the Halstead Reach block alternatives without zoning. Compare paper path counts before and after closing one link; an unzoned network cannot supply a meaningful traffic-volume comparison. Calculate road metres per dwelling, recording road length and dwelling capacity separately. Commit the chosen block dimension for Week 3 and upload the save and sheet by 21:00. Follow the studio brief.

Assessment connection

Feeds Assessment 1, the Neighbourhood Unit Plan (Week 4, 25%), where the mobility criterion at 30 marks is read directly off the block structure laid down this week, and the fiscal criterion at 30 marks is read off the upkeep it generates. Also builds toward Week 6’s unweighted peak-load stress test, which is run against this layout — a network with no redundancy fails that test for a decision made in Week 2.

Teaching team