Three architectural models move from a neighbourhood catchment through exposed infrastructure to the whole district.

Assessment

Every piece of graded work in the course, what it is worth, and when it is due.

Three pieces of assessed work, each one pinned up in the studio and defended to a jury rather than handed in and marked out of sight. The two plans are marked against the same three metrics the studio argues about all semester — livability, fiscal performance and mobility performance. The capstone is judged as one plan.

A circular neighbourhood plan with twelve residential blocks around a tree-lined shared amenity, a walking catchment and a transit corridor.

Neighbourhood Unit Plan

Plan and defend a single neighbourhood unit — its block pattern, its zoning, and the amenity everything else is arranged around. First assessed pin-up of the semester.

Due 15 March 2027 · Weight: 25%

An exploded infrastructure drawing separates a planted street level from two exposed utility networks, joined by vertical service connections.

Public Realm and Infrastructure Plan

The district after the break: its parks, plazas and streets planned together with the utility networks beneath them, and costed against a budget that will not stretch.

Due 3 May 2027 · Weight: 25%

A city-wide map of dense urban blocks divided by a winding river, with bridges, a transit route and three comparison bars.

Comprehensive City Plan

The capstone: the whole district argued as one plan — every zoning, transit, budget and public-realm decision since Week 1, defended end to end at the final jury.

Due 24 May 2027 · Weight: 50%