Week 1: Site Analysis and the Blank Map

Terrain, climate and constraint as the first design move — reading a site before a single road goes down, and naming the three metrics the studio is marked against all semester.

22 February 2027

Open the slides

The argument

Before a single road goes down, the site has already decided most of what the district can afford, how far people will have to travel, and how pleasant it will be to live in — so the studio reads the ground first, and names the three metrics it will be read against for the next twelve weeks.

What you will learn

Theory into practice

The deck walks through where each of these lands, slide by slide, against the studio’s own site.

Simulation mapping

Theory moveCities: Skylines II mechanicWhat students should watch happen
McHarg’s single-factor layersThe info views, read one at a time — natural resources, water, land value, ground pollution, and the wind arrows inside air pollutionThe same 4 km of riverbank scores differently under each overlay, and no single overlay picks the site
Geddes’s survey before planThe map at hour zero, with the road tool not yet openedFertile soil, ore and forest are already priced into the ground before any spending decision is made
Lynch’s paths, edges, districts, nodes, landmarksThe terrain and outside connections on the standard map — the River Kerrow, the Dunthorpe interchange, the rail line entering from the eastThe site has a structure before it has a plan, and the structure is legible from the map alone
Lynch’s performance dimensionsWell-being and health readouts, the land value overlay, the economy panel’s monthly balanceThree different panels are needed to answer one question about quality, which is why the studio names three metrics rather than one
George on location valueThe land value overlay, and building level 1–5 responding to itLand value rises around things the district paid for collectively, not around the buildings that sit on it
Terrain as costRoad placement on gradient, terraforming charges, water pumping heightThe same 400 m of road costs a different amount depending on which contour it crosses

Evidence standard. Named interface fields are direct readouts. Calculations shown from those fields are derived measures. Every fixed scenario value on this page is a worked hypothetical, not a captured run. See resources and evidence for access arrangements and worksheets.

The decision this week

Fiscal performance against livability, forced by where the first road goes: the cheap, flat Halstead Reach terrace against the costlier, better-sited Ludworth Bench shelf on Verrall Ridge. The deck works the two sites’ numbers side by side. Students defend a site preference on paper. The cohort then uses Halstead Reach for comparable experiments; the first confirmed road is placed in Week 2.

Into the studio

Arrive on Monday with the untouched Kerrow Basin map. Survey five overlays, then drag and cancel candidate roads to measure length and gradient; confirm no road. Defend either site in the report, but continue on Halstead Reach as the shared lab site. Save the untouched archive as <student ID>-w01; upload it and the site report by 21:00. Read the studio brief for the room sequence.

Assessment connection

Feeds Assessment 1, the Neighbourhood Unit Plan (Week 4, 25%) directly: the settlement area chosen this week is the ground that plan sits on, and the site report is the evidence the defence memo will cite when it explains why the unit is where it is. More broadly, this lecture defines the three criteria that every assessment in the studio is marked against, so its definitions are loadbearing for all three. No weighted assessment is due; the weekly save and report upload still applies.