Skip to main content

Patel household, Brisbane: intake dossier

Release A for the Brisbane home: the homeowners' brief, the property as it stands, and what nobody yet knows. Issued in week 1.

Case material. The Patel household and this property are teaching fiction for the Household Resilience Loan Programme case. Dimensions are an internally consistent educational model, not a survey.

Illustration of attached two-storey townhouses with compact courtyards.
Conceptual illustration of the Brisbane two-storey townhouse (2006) with an internal garage, in a nine-lot community titles scheme home. Use the scaled plans below for geometry.

Intake note

Common Ground Engineering, first client meeting, 24 February 2027

Priya and Rohan Patel bought the townhouse in 2019. The scheme's building committee has to see anything visible from common property, and a neighbour's pump was the subject of a noise complaint last year.

They want food from a small space, a courtyard they can still sit in, and silence at night. They use a 40 m² plot in the shared garden and know it is not theirs.

Household: Priya and Rohan Patel and their two children, aged 9 and 11. For comparability every case uses the course's demand convention for two adults and two children aged 9 to 13.

Dwelling
Two-storey townhouse (2006) with an internal garage, in a nine-lot community titles scheme
Tenure
Owner-occupied lot. Body corporate consent is needed for anything visible, attached or changing stormwater.
Climate
Bureau of Meteorology station 040214; long-term statistics on the datasets page

In the homeowners' words

Priorities and service targets

The household's priorities, in their order:

  1. Grow something worthwhile in a small space without losing the courtyard.
  2. Nothing the body corporate will refuse, and nothing audible at the boundary at night.
  3. Compact equipment that fits through a 600 mm path.
  4. Use the shared-garden allocation well, without installing anything on it.

Agreed at intake as the service targets a proposal must meet. They are checked in an average year; the dry year is where the case for extra spending gets made.

TargetService the client needsMet today?
T1At least 70 % of toilet flushing supplied from rainwater in the average yearno
T2At least 120 kg of fresh produce a year from the lot and the shared-garden allocation togetherno
T3The existing beds (12 m²) fully watered from rainwater in at least 9 months of the average yearyes
T4Nothing audible above 45 dB(A) at a boundary at night, everything delivered through the 600 mm path, the courtyard sitting area kept, and at most 3 hours of care a weekyes
model estimateClient priority service targets. The existing condition is checked against each in the specialists' model.

Attainable, with room to spare. A staff check across the published decision ranges found options meeting all four targets that leave at least $25,500 of the $30,000 allowance and at least 4.5 kWh/day of the energy cap unused. Which option, and whether to spend more than the minimum, is your call to make and defend.

The property

The townhouse is lot 4 of a nine-lot scheme. The 40 m² allocation in the shared garden is common property: it lies outside the 300 m² lot, is held by body corporate resolution, and is never counted as part of the lot.

Brisbane: the scheme, the lot and the shared-garden allocationCommon driveway (common property)Visitor parkingShared gardencommon propertySG · 40 m²123Lot 4Patel, 300 m²56789StreetN020 m
Scheme plan, schematic and not to survey. Lots 1 to 9 are private. The common driveway, visitor parking and the 360 m² shared garden are common property. The Patel allocation is 40 m² of the shared garden, held by body corporate resolution, and is not part of their 300 m² lot (lot 4).

Site plan: what covers the ground

Brisbane site planB1B2H1H2H3H4G1G2V1E1E2T1X1P1P2P4RL 100.0RL 100.210 m30 mCommon driveway (common property)N024 m
Key to brisbane site plan
IDFeatureArea or size
B1Townhouse · Building — two storey; party wall on the west boundary128.8 m² (roof 142.1 m²)
B2Store · Building — steel, no gutter4 m² (roof 5.8 m²)
H1Driveway apron · Hardstand — meets the scheme's common driveway17.5 m²
H2Side path · Hardstand — 0.8 m between wall and fence; 600 mm clear past the meter box and downpipes20 m²
H3Courtyard · Hardstand — paved; the family's outdoor room36 m²
H4Courtyard, east · Hardstand — paved6 m²
G1Front bed · Growing zone — visible from the common driveway32.5 m²
G2Rear garden · Growing zone — morning sun; shaded after about 11 am by the neighbour's poinciana55.2 m²
V1Patio roof · Roof over hardstand — polycarbonate over the sitting arearoof 19.8 m²
T1Existing 3 kL slimline tank · Tank — poly, 2018, rear roof plane, gravity tap3 kL
E1Neighbour's poinciana · Tree canopy — off-site; canopy over the rear gardencanopy ≈ 9 m
E2Dwarf citrus (pot) · Tree canopy — movablecanopy ≈ 1.2 m
X1Common-property services easement — scheme services cross the rear 1.5 m; no structuresknown13.8 m²
P1Meter box and water meter
P2Sewer connection (lot) — scheme drain inspection point
P4Courtyard drain to common stormwater
A1Pedestrian access: side path only

Hatched: growing zone. Dotted: retained recreation. Dashed outline: roof edge or tree canopy. Cross-hatched strip: easement or exclusion zone. Triangles: estimated spot levels. Squares: service points.

Roof and catchment

Roof plan area is footprint plus eaves, plus any roof over hardstand. It is the area that collects rain, and it is not the same number as the footprint or the pitched roof surface. Only the shaded zones drain to storage today.

Brisbane roof zones and downpipesR1R2R3R4T110 m30 mCommon driveway (common property)N024 m
Key to brisbane roof zones and downpipes
IDRoof zonePlan areaDownpipesNow
R1Townhouse, front plane — to the scheme's driveway drain71 m²1not connected
R2Townhouse, rear plane — the only zone on the 3 kL slimline tank71 m²1to storage
R3Patio roof — gutter to the courtyard drain20 m²1not connected
R4Store — no gutter6 m²no gutternot connected
T1Existing 3 kL slimline tank — poly, 2018, rear roof plane, gravity tap3 kL

Shaded zones drain to storage now; dashed zones do not. Circles are downpipes. Areas are roof plan area, eaves included.

Floor plan

Enough to locate the wet areas, the fixtures a rainwater or greywater line would reach, and the services. Not a construction drawing.

Brisbane floor planGarageF2F3LaundryWCStoreLiving and diningKitchenQ1N9.2 m × 14 m
Rooms in brisbane floor plan
IDRoomArea
F1Garage — single car; water heater on the rear wall20.4 m²
F2Entry and stair9 m²
F3Meter cupboard and riserservices8.4 m²
F4Laundrywet area — internal, no external door7.2 m²
F5WCwet area — ground floor4.8 m²
F6Store5.4 m²
F7Living and dining41.6 m²
F8Kitchenwet area — sink and dishwasher; bathroom above32 m²
Q1Stack from the first-floor bathroom

Shaded rooms are wet areas; the darker band is services. Internal walls are indicative.

Areas, and how they reconcile

QuantityFrom the planCase parameterNote
Lot300 m²300 m²the plan is the whole lot
Building footprint132.8 m²ground the buildings cover
Roof plan area167.6 m²170 m²within tolerance; 34.8 m² is eaves and roof over hardstand
Roof connected to storage now71 m²of 161.8 m² that has gutters
Designated growing area87.7 m²90 m²within tolerance
Shared-garden allocation40 m²40 m²common property, outside the lot
Retained recreation outside it0 m²not available to the design
Hardstand79.5 m²drives, paths, slabs
Other ground0 m²setbacks and narrow strips
course assumptionAreas computed from the plan geometry. Plans are drawn to round dimensions, so derived totals reproduce the case parameters within 15 m² or 4 %, whichever is larger.

Services and ground

Each fact is marked known when it comes from a document or a measurement at intake, estimate when it is someone's estimate, and to be measured when nobody knows yet. Nothing here is surveyed.

Slope
Essentially level: the lot falls about 0.2 m to the common driveway, which is its only drainage outlet. Levels are from the 2006 scheme plan. estimate
Water
Mains, individually metered in the meter box beside the side path. known
Sewer
Connected to the scheme's common drain; the lot's inspection point is in the courtyard. known
Power
Underground supply, 40 A single phase, individually metered. known
Gas
None. known
Stormwater
Roof and courtyard drain to the common system. Any change needs body corporate consent. known

What is already there

Bills the household supplied

Water: four quarterly bills totalling 219 kL, at $3.40/kL usage charge plus a fixed supply charge. known

Electricity: twelve monthly totals for the whole house. No circuit is metered separately. known

January to MarchApril to JuneJuly to SeptemberOctober to December
54 kL55 kL55 kL55 kL
synthetic dataWater use from the last four quarterly bills. Bills cannot show what the garden used, or when within a quarter.

Case constraints

Rainwater may serve
toilet flushing, garden irrigation
It serves today
garden irrigation
Care available
up to 3 hours a week; nothing needed more often than every 2 days; everything survives 14 days unattended

What a design may change

The home is fixed. A design may add storage in the permitted zones (the published steps are 0, 2, 4 kL, slimline modules only), connect roof zones R1, R3 that have gutters but no connection, and cultivate up to 116 m² beyond the existing plantings. It may not build roof, buy land, or enlarge anything. The other decision variables are on the method page.

What nobody knows yet

16 facts above come from documents. These do not, and they are the starting point for your measurement programme: