Week 7 Session: Designing the road

Matching three real road profiles from this unit's dataset to an engineering measure, then defending that choice against a complication.

5 April 2027

Before the session

Read the three site cards below and the measure-comparison and cost tables from this week’s lecture. If you kept a note of the technology gap you identified in Week 6, bring it — it’s useful context, not required material.

The three sites

Site A — Bunjalung Ridge Road. 15 km, Central Tablelands, 400 vehicles a day. Medium reporting coverage from an irregular ranger patrol and an active local wildlife-carer network. Authority: a small local council with a tightly constrained annual roads budget. Roadside scrub runs continuously both sides for most of the road’s length — there’s no single obvious pinch point.

Site B — Coorabin Road. 38 km, Northern Ranges, 2,800 vehicles a day. High reporting coverage: daily ranger patrols and fixed traffic cameras near two intersections. Authority: a regional road authority with a moderate discretionary budget, competing against many other roads in its network. Two known clustering points sit near creek crossings; the rest of the road runs lower frequency.

Site C — Merricourt Highway. 51 km, Coastal Corridor, 4,500 vehicles a day. High reporting coverage: routine highway-patrol coverage and a permanent traffic counter. Authority: a state transport department with a larger capital budget but a slower, more politically visible approval pipeline. Strikes are distributed along a long open corridor with no single obvious pinch point.

In the session

StepTimeActivity
15 minGroups of three or four read all three site cards together.
210 minEach group proposes one measure per site, with a one-line justification citing the evidence or cost table.
310 minSwap site assignments with another group, who raises one counter-scenario for each of your proposed measures (for example: the council’s fencing budget is cut by half; the underpass floods every wet season; the highway authority’s approval process will take three years longer than the funding cycle allows).
410 minRevise your proposal for each site in light of the counter-scenario you were given.
510 minWhole-room share-out: each group reports the one revision that most changed their original answer, and why.
65 minWrite the one-page “Fence Is Not the Finish Line” design note (see below).

Design note format (formative, not a final-project attachment)

One page, one site of your choice. State: the measure you recommend, the justification tied to the evidence or cost table, at least one limitation or risk your revision surfaced (an end-of-fence problem, a budget ceiling, an approval-timeline mismatch), and what evidence would change your recommendation. This is a formative output for this week’s activity — it is not required anywhere in assignment-1 or the final-project.

Afterwards

Keep a note of any site where no engineering measure looked adequate on its own — those carry directly into Week 8’s law-and-liability material, where the question shifts from “what should be built” to “who has to pay for it, or answer for its absence.”

The spec

What you bring to the session. Written so a reader can tell whether it has been met without asking you.

Teaching team