Skip to main content

Week 4 Guided session: Project 1 Evaluation and Packaging

Run the released evaluation pipeline, verify a fresh-process load, and reconcile the report, ledger, and model package before submission

15 March 2027 · Guided session

Estimated active time: 60 minutes · Release: Monday 15 March 2027 at 09:00 AET · Solution release: immediate submission checklist; no model solution.

Learning goals

Preparation

Freeze a candidate checkpoint and decoding configuration. Stop principal training before beginning this audit; the session introduces no new method.

Activity

  1. Run all five development examples and retain unedited outputs with decoding settings.
  2. Run the public PPL/BPB, repetition, and stopping checks; label development evidence correctly.
  3. Load the checkpoint in a fresh process and reproduce one output from the documented command.
  4. Verify parameter count, compute-ledger.json, tokenizer, sampler, checksums, GitLab commit, and HF revision.
  5. Complete the rubric-evidence map and the ass1_report.pdf/portal checklist.

Expected output and self-check

Retain one fresh-load log, evaluation summary, final manifest, and completed checklist. Do not submit if the documented command loads different weights, the report names a different revision, or any secret appears in the package.

The spec

What you bring to the session. Written so a reader can tell whether it has been met without asking you.

Teaching team