Alex Taylor rang the programme's referral line after a summer in which the garden was watered from the mains every evening. Both parents work weekdays; the children are 9 and 12 and use the back lawn every afternoon.
They want the fruit trees and raised beds kept going through summer without mains water, and anything installed to keep working through a Canberra July. Morgan's condition for signing: nothing that needs checking on a weeknight.
Household: Alex and Morgan Taylor and their two children, aged 9 and 12. For comparability every case uses the course's demand convention for two adults and two children aged 9 to 13.
- Dwelling
- Single-storey brick-veneer house (1978) with a detached garage, carport and garden shed
- Tenure
- Owner-occupied residential lease. No body corporate.
- Climate
- Bureau of Meteorology station 070014; long-term statistics on the datasets page
In the homeowners' words
- “The tank is empty by January most years and we water off the mains all summer.”
- “The back lawn is where the kids actually play. We are not digging all of it up.”
- “Nobody is home to look at anything between Monday and Friday.”
- “The herb strip never does much. I assumed it was the soil.”
- “Whatever we do has to keep working through July, when everything here freezes.”
Priorities and service targets
The household's priorities, in their order:
- Keep the fruit trees and the raised beds productive through summer without watering from the mains.
- Make whatever is installed work reliably through a Canberra winter, including frosts.
- Keep a real lawn for the children: at least 100 m² of the back lawn stays lawn.
- Nothing that needs attention on a weekday.
Agreed at intake as the service targets a proposal must meet. They are checked in an average year; the dry year is where the case for extra spending gets made.
| Target | Service the client needs | Met today? |
|---|---|---|
| T1 | The raised beds and fruit trees (45 m²) fully watered from on-site water, with no mains irrigation, in every month of the average year | no |
| T2 | Toilet and laundry supplied at least 90 % from rainwater in June, July and August | no |
| T3 | Everything installed keeps working through a Canberra July: pumps and exposed pipework frost-protected, and the energy check made in the peak month | yes |
| T4 | At least 100 m² of the back lawn kept; at most 2 hours of care a week, none of it needed more often than weekly | yes |
Attainable, with room to spare. A staff check across the published decision ranges found options meeting all four targets that leave at least $22,500 of the $30,000 allowance and at least 4.5 kWh/day of the energy cap unused. Which option, and whether to spend more than the minimum, is your call to make and defend.
The property
Site plan: what covers the ground
| ID | Feature | Area or size |
|---|---|---|
| B1 | House · Building — single storey, tiled roof | 168.2 m² (roof 201 m²) |
| B2 | Garage · Building — boundary wall to the east, steel roof | 36 m² (roof 41.6 m²) |
| B3 | Shed · Building — steel, no gutter | 7.5 m² (roof 9.9 m²) |
| H1 | Driveway · Hardstand — concrete, falls to the street | 74.8 m² |
| H2 | Terrace · Hardstand — paved, north of the house | 34.8 m² |
| G1 | Front garden · Growing zone — lawn and shrubs; the house shades it from May to August | 99.6 m² |
| G2 | East side bed · Growing zone — morning sun; meters and hot-water unit on this wall | 55.1 m² |
| G3 | Back lawn · Growing zone — where the children play; the family keeps at least 100 m² of it as lawn | 133 m² |
| G4 | North beds · Growing zone — warmest aspect; the two raised beds are here | 70 m² |
| G5 | Orchard strip · Growing zone — apple, pear and plum | 72 m² |
| G6 | Herb strip · Growing zone — beside the shed; the neighbour's eucalypt shades it after 2 pm | 13.2 m² |
| V1 | Carport · Roof over hardstand — steel roof over the driveway | roof 26.6 m² |
| V2 | Verandah · Roof over hardstand — polycarbonate over part of the terrace | roof 16.6 m² |
| T1 | Existing 5 kL tank · Tank — poly, 2009, garage roof only, gravity tap | 5 kL |
| E1 | Apple · Tree canopy — mature | canopy ≈ 4.2 m |
| E2 | Pear · Tree canopy — mature | canopy ≈ 3.8 m |
| E3 | Plum · Tree canopy — partly shaded by the pear | canopy ≈ 3 m |
| E4 | Neighbour's eucalypt · Tree canopy — off-site; shades the west of the back garden from about 2 pm | canopy ≈ 10 m |
| X1 | Sewer easement — 1.8 m along the rear boundary on the title; main depth and alignment not verifiedestimate | 36 m² |
| P1 | Water meter | |
| P2 | Gas meter and hot-water unit | |
| P3 | Switchboard | |
| P4 | Sewer connection (approximate) — the house drain is assumed to leave the south-west corner; not locatedto be measured | |
| P5 | Stormwater to kerb | |
| A1 | Vehicle access |
Hatched: growing zone. Dotted: retained recreation. Dashed outline: roof edge or tree canopy. Cross-hatched strip: easement or exclusion zone. Triangles: estimated spot levels. Squares: service points.
Roof and catchment
Roof plan area is footprint plus eaves, plus any roof over hardstand. It is the area that collects rain, and it is not the same number as the footprint or the pitched roof surface. Only the shaded zones drain to storage today.
| ID | Roof zone | Plan area | Downpipes | Now |
|---|---|---|---|---|
| R1 | House, north plane — gutters renewed 2021; both downpipes go to stormwater | 100 m² | 2 | not connected |
| R2 | House, south plane — downpipes at the two front corners | 100 m² | 2 | not connected |
| R3 | Garage — the only zone plumbed to the 5 kL tank | 42 m² | 1 | to storage |
| R4 | Carport — drains onto the driveway | 27 m² | 1 | not connected |
| R5 | Verandah — gutter to a garden bed | 17 m² | 1 | not connected |
| R6 | Shed — no gutter fitted | 10 m² | no gutter | not connected |
| T1 | Existing 5 kL tank — poly, 2009, garage roof only, gravity tap | 5 kL |
Shaded zones drain to storage now; dashed zones do not. Circles are downpipes. Areas are roof plan area, eaves included.
Floor plan
Enough to locate the wet areas, the fixtures a rainwater or greywater line would reach, and the services. Not a construction drawing.
| ID | Room | Area |
|---|---|---|
| F1 | Bedroom 2 | 16.4 m² |
| F2 | Bedroom 3 | 16.4 m² |
| F3 | Bedroom 1 | 16 m² |
| F4 | Hall | 13.9 m² |
| F5 | Bathroomwet area — shower over bath, basin | 10.1 m² |
| F6 | WCwet area | 5 m² |
| F7 | Study | 17.3 m² |
| F8 | Laundrywet area — tub and washing machine; door to the east side | 9.4 m² |
| F9 | Living and dining | 41.8 m² |
| F10 | Kitchenwet area — sink and dishwasher on the east wall | 22 m² |
| Q1 | Laundry door | |
| Q2 | Hot-water unit (external) |
Shaded rooms are wet areas; the darker band is services. Internal walls are indicative.
Areas, and how they reconcile
| Quantity | From the plan | Case parameter | Note |
|---|---|---|---|
| Plot | 800 m² | 800 m² | the plan is the whole lot |
| Building footprint | 211.7 m² | ground the buildings cover | |
| Roof plan area | 295.7 m² | 300 m² | within tolerance; 84 m² is eaves and roof over hardstand |
| Roof connected to storage now | 41.6 m² | of 285.8 m² that has gutters | |
| Designated growing area | 442.9 m² | 450 m² | within tolerance |
| Kept as lawn, inside it | 100 m² | a client constraint, so at most 342.9 m² may be cultivated | |
| Retained recreation outside it | 0 m² | not available to the design | |
| Hardstand | 109.6 m² | drives, paths, slabs | |
| Other ground | 35.8 m² | setbacks and narrow strips |
Services and ground
Each fact is marked known when it comes from a document or a measurement at intake, estimate when it is someone's estimate, and to be measured when nobody knows yet. Nothing here is surveyed.
- Slope
- Falls about 1.2 m from the rear fence to the street, roughly 3 per cent, estimated from the ACT contour map. Enough for gravity from the back garden towards the street, not the reverse. estimate
- Water
- Mains water, 20 mm meter at the street on the east side. known
- Sewer
- Connected. The main is on the title in the rear easement, but where the house drain runs has not been located. to be measured
- Power
- Overhead supply, 63 A single phase. known
- Gas
- Natural gas; storage hot-water unit on the east wall. known
- Stormwater
- Roof and driveway both discharge to the street kerb. known
What is already there
- 5 kL poly rainwater tank (2009), fed by the garage roof, gravity garden tap, no pump.
- Two timber raised beds, about 9 m² in total, in the north beds.
- Apple, pear and plum trees, mature, in the orchard strip.
- One 220 L compost tumbler.
- Hose and oscillating sprinkler on a tap timer, run from the mains in summer over the beds and fruit trees, about 45 m².
Bills the household supplied
Water: four quarterly bills totalling 244 kL, at $3.10/kL usage charge plus a fixed supply charge. known
Electricity: twelve monthly totals for the whole house. No circuit is metered separately. known
| January to March | April to June | July to September | October to December |
|---|---|---|---|
| 68 kL | 56 kL | 55 kL | 65 kL |
Case constraints
- Retained lawn: at least 100 m² of the back lawn (G3) stays lawn, so at most 33 m² of it may be cultivated.
- Maintenance: up to 2 hours a week, on one weekend day only. Nothing may need attention more often than every 7 days.
- Installation zones: new tanks only on the east side of the house (G2 and the driveway edge) or in the orchard strip clear of the tree canopies. Nothing in the sewer easement, nothing forward of the house.
- Disruption: up to five working days on site. No internal plumbing work during school term.
- Permitted uses of rainwater: garden irrigation, toilet flushing and laundry. The family does not want rainwater for drinking, cooking or bathing.
- Rainwater may serve
- toilet flushing, laundry, garden irrigation
- It serves today
- garden irrigation
- Care available
- up to 2 hours a week; nothing needed more often than every 7 days; everything survives 21 days unattended
What a design may change
The home is fixed. A design may add storage in the permitted zones (the published steps are 0, 5, 10, 15, 20 kL), connect roof zones R1, R2, R4, R5 that have gutters but no connection, and cultivate up to 298 m² beyond the existing plantings. It may not build roof, buy land, or enlarge anything. The other decision variables are on the method page.
What nobody knows yet
14 facts above come from documents. These do not, and they are the starting point for your measurement programme:
- Where the house drain and the sewer main actually run, and how deep they are.
- Soil texture, pH and organic matter in each growing zone.
- Why the herb strip underperforms: shade, root competition from the eucalypt, or soil.
- How much water the household uses indoors, month by month, and how it splits between uses.
- Whether the house gutters can be connected to storage without regrading them.
- How cold the ground and any exposed pipework get on the worst July nights.