Taylor household, Canberra: intake dossier

Release A for the Canberra home: the homeowners' brief, the property as it stands, and what nobody yet knows. Issued in week 1.

Case material. The Taylor household and this property are teaching fiction for the Household Resilience Loan Programme case. Dimensions are an internally consistent educational model, not a survey.

Illustration of a brick-veneer suburban house among mature eucalypts.
Conceptual illustration of the Canberra single-storey brick-veneer house (1978) with a detached garage, carport and garden shed home. Use the scaled plans below for geometry.

Intake note

Common Ground Engineering, first client meeting, 22 February 2027

Alex Taylor rang the programme's referral line after a summer in which the garden was watered from the mains every evening. Both parents work weekdays; the children are 9 and 12 and use the back lawn every afternoon.

They want the fruit trees and raised beds kept going through summer without mains water, and anything installed to keep working through a Canberra July. Morgan's condition for signing: nothing that needs checking on a weeknight.

Household: Alex and Morgan Taylor and their two children, aged 9 and 12. For comparability every case uses the course's demand convention for two adults and two children aged 9 to 13.

Dwelling
Single-storey brick-veneer house (1978) with a detached garage, carport and garden shed
Tenure
Owner-occupied residential lease. No body corporate.
Climate
Bureau of Meteorology station 070014; long-term statistics on the datasets page

In the homeowners' words

Priorities and service targets

The household's priorities, in their order:

  1. Keep the fruit trees and the raised beds productive through summer without watering from the mains.
  2. Make whatever is installed work reliably through a Canberra winter, including frosts.
  3. Keep a real lawn for the children: at least 100 m² of the back lawn stays lawn.
  4. Nothing that needs attention on a weekday.

Agreed at intake as the service targets a proposal must meet. They are checked in an average year; the dry year is where the case for extra spending gets made.

TargetService the client needsMet today?
T1The raised beds and fruit trees (45 m²) fully watered from on-site water, with no mains irrigation, in every month of the average yearno
T2Toilet and laundry supplied at least 90 % from rainwater in June, July and Augustno
T3Everything installed keeps working through a Canberra July: pumps and exposed pipework frost-protected, and the energy check made in the peak monthyes
T4At least 100 m² of the back lawn kept; at most 2 hours of care a week, none of it needed more often than weeklyyes
model estimateClient priority service targets. The existing condition is checked against each in the specialists' model.

Attainable, with room to spare. A staff check across the published decision ranges found options meeting all four targets that leave at least $22,500 of the $30,000 allowance and at least 4.5 kWh/day of the energy cap unused. Which option, and whether to spend more than the minimum, is your call to make and defend.

The property

Site plan: what covers the ground

Canberra site planB1B2B3H1H2G1G2G3G4G5G6V1V2E1E2E3E4T1X1P1P2P3P4P5RL 100.0RL 101.220 m40 mStreetN0510 m
Key to canberra site plan
IDFeatureArea or size
B1House · Building — single storey, tiled roof168.2 m² (roof 201 m²)
B2Garage · Building — boundary wall to the east, steel roof36 m² (roof 41.6 m²)
B3Shed · Building — steel, no gutter7.5 m² (roof 9.9 m²)
H1Driveway · Hardstand — concrete, falls to the street74.8 m²
H2Terrace · Hardstand — paved, north of the house34.8 m²
G1Front garden · Growing zone — lawn and shrubs; the house shades it from May to August99.6 m²
G2East side bed · Growing zone — morning sun; meters and hot-water unit on this wall55.1 m²
G3Back lawn · Growing zone — where the children play; the family keeps at least 100 m² of it as lawn133 m²
G4North beds · Growing zone — warmest aspect; the two raised beds are here70 m²
G5Orchard strip · Growing zone — apple, pear and plum72 m²
G6Herb strip · Growing zone — beside the shed; the neighbour's eucalypt shades it after 2 pm13.2 m²
V1Carport · Roof over hardstand — steel roof over the drivewayroof 26.6 m²
V2Verandah · Roof over hardstand — polycarbonate over part of the terraceroof 16.6 m²
T1Existing 5 kL tank · Tank — poly, 2009, garage roof only, gravity tap5 kL
E1Apple · Tree canopy — maturecanopy ≈ 4.2 m
E2Pear · Tree canopy — maturecanopy ≈ 3.8 m
E3Plum · Tree canopy — partly shaded by the pearcanopy ≈ 3 m
E4Neighbour's eucalypt · Tree canopy — off-site; shades the west of the back garden from about 2 pmcanopy ≈ 10 m
X1Sewer easement — 1.8 m along the rear boundary on the title; main depth and alignment not verifiedestimate36 m²
P1Water meter
P2Gas meter and hot-water unit
P3Switchboard
P4Sewer connection (approximate) — the house drain is assumed to leave the south-west corner; not locatedto be measured
P5Stormwater to kerb
A1Vehicle access

Hatched: growing zone. Dotted: retained recreation. Dashed outline: roof edge or tree canopy. Cross-hatched strip: easement or exclusion zone. Triangles: estimated spot levels. Squares: service points.

Roof and catchment

Roof plan area is footprint plus eaves, plus any roof over hardstand. It is the area that collects rain, and it is not the same number as the footprint or the pitched roof surface. Only the shaded zones drain to storage today.

Canberra roof zones and downpipesR1R2R3R4R5R6T120 m40 mStreetN0510 m
Key to canberra roof zones and downpipes
IDRoof zonePlan areaDownpipesNow
R1House, north plane — gutters renewed 2021; both downpipes go to stormwater100 m²2not connected
R2House, south plane — downpipes at the two front corners100 m²2not connected
R3Garage — the only zone plumbed to the 5 kL tank42 m²1to storage
R4Carport — drains onto the driveway27 m²1not connected
R5Verandah — gutter to a garden bed17 m²1not connected
R6Shed — no gutter fitted10 m²no gutternot connected
T1Existing 5 kL tank — poly, 2009, garage roof only, gravity tap5 kL

Shaded zones drain to storage now; dashed zones do not. Circles are downpipes. Areas are roof plan area, eaves included.

Floor plan

Enough to locate the wet areas, the fixtures a rainwater or greywater line would reach, and the services. Not a construction drawing.

Canberra floor planBedroom 2Bedroom 3Bedroom 1HallBathroomWCStudyLaundryLiving and diningKitchenQ1Q2N11.6 m × 14.5 m
Rooms in canberra floor plan
IDRoomArea
F1Bedroom 216.4 m²
F2Bedroom 316.4 m²
F3Bedroom 116 m²
F4Hall13.9 m²
F5Bathroomwet area — shower over bath, basin10.1 m²
F6WCwet area5 m²
F7Study17.3 m²
F8Laundrywet area — tub and washing machine; door to the east side9.4 m²
F9Living and dining41.8 m²
F10Kitchenwet area — sink and dishwasher on the east wall22 m²
Q1Laundry door
Q2Hot-water unit (external)

Shaded rooms are wet areas; the darker band is services. Internal walls are indicative.

Areas, and how they reconcile

QuantityFrom the planCase parameterNote
Plot800 m²800 m²the plan is the whole lot
Building footprint211.7 m²ground the buildings cover
Roof plan area295.7 m²300 m²within tolerance; 84 m² is eaves and roof over hardstand
Roof connected to storage now41.6 m²of 285.8 m² that has gutters
Designated growing area442.9 m²450 m²within tolerance
Kept as lawn, inside it100 m²a client constraint, so at most 342.9 m² may be cultivated
Retained recreation outside it0 m²not available to the design
Hardstand109.6 m²drives, paths, slabs
Other ground35.8 m²setbacks and narrow strips
course assumptionAreas computed from the plan geometry. Plans are drawn to round dimensions, so derived totals reproduce the case parameters within 15 m² or 4 %, whichever is larger.

Services and ground

Each fact is marked known when it comes from a document or a measurement at intake, estimate when it is someone's estimate, and to be measured when nobody knows yet. Nothing here is surveyed.

Slope
Falls about 1.2 m from the rear fence to the street, roughly 3 per cent, estimated from the ACT contour map. Enough for gravity from the back garden towards the street, not the reverse. estimate
Water
Mains water, 20 mm meter at the street on the east side. known
Sewer
Connected. The main is on the title in the rear easement, but where the house drain runs has not been located. to be measured
Power
Overhead supply, 63 A single phase. known
Gas
Natural gas; storage hot-water unit on the east wall. known
Stormwater
Roof and driveway both discharge to the street kerb. known

What is already there

Bills the household supplied

Water: four quarterly bills totalling 244 kL, at $3.10/kL usage charge plus a fixed supply charge. known

Electricity: twelve monthly totals for the whole house. No circuit is metered separately. known

January to MarchApril to JuneJuly to SeptemberOctober to December
68 kL56 kL55 kL65 kL
synthetic dataWater use from the last four quarterly bills. Bills cannot show what the garden used, or when within a quarter.

Case constraints

Rainwater may serve
toilet flushing, laundry, garden irrigation
It serves today
garden irrigation
Care available
up to 2 hours a week; nothing needed more often than every 7 days; everything survives 21 days unattended

What a design may change

The home is fixed. A design may add storage in the permitted zones (the published steps are 0, 5, 10, 15, 20 kL), connect roof zones R1, R2, R4, R5 that have gutters but no connection, and cultivate up to 298 m² beyond the existing plantings. It may not build roof, buy land, or enlarge anything. The other decision variables are on the method page.

What nobody knows yet

14 facts above come from documents. These do not, and they are the starting point for your measurement programme: