Rossi household, Adelaide: intake dossier

Release A for the Adelaide home: the homeowners' brief, the property as it stands, and what nobody yet knows. Issued in week 1.

Case material. The Rossi household and this property are teaching fiction for the Household Resilience Loan Programme case. Dimensions are an internally consistent educational model, not a survey.

Illustration of a single-storey double-brick suburban house and front garden.
Conceptual illustration of the Adelaide double-brick house (1965) with a detached garage reached by a side driveway home. Use the scaled plans below for geometry.

Intake note

Common Ground Engineering, first client meeting, 25 February 2027

Elena Rossi keeps the vegetable beds and Marco keeps the household accounts. Every January the beds slump while the water bill climbs, and both of them are tired of it.

Their questions at intake were about money: what it would cost to run, every year, before anything is agreed. The back lawn stays; that was the first thing they said.

Household: Elena and Marco Rossi and their two children, aged 10 and 12. For comparability every case uses the course's demand convention for two adults and two children aged 9 to 13.

Dwelling
Double-brick house (1965) with a detached garage reached by a side driveway
Tenure
Owner-occupied freehold. No body corporate.
Climate
Bureau of Meteorology station 023000; long-term statistics on the datasets page

In the homeowners' words

Priorities and service targets

The household's priorities, in their order:

  1. Reliable summer irrigation for the beds and fruit trees without a rising water bill.
  2. A food garden that stays manageable across the year instead of peaking and collapsing.
  3. Running costs that are low, predictable and stated in dollars a year.

Agreed at intake as the service targets a proposal must meet. They are checked in an average year; the dry year is where the case for extra spending gets made.

TargetService the client needsMet today?
T1The vegetable beds and fruit trees (56 m²) at least 90 % watered from on-site water across December to Februaryno
T2New running costs of $250 a year or less, stated in dollarsyes
T3The garden producing in at least 10 months of the average yearyes
T4The back lawn kept; at most 3 hours of routine care a weekyes
model estimateClient priority service targets. The existing condition is checked against each in the specialists' model.

Attainable, with room to spare. A staff check across the published decision ranges found options meeting all four targets that leave at least $25,500 of the $30,000 allowance and at least 4.5 kWh/day of the energy cap unused. Which option, and whether to spend more than the minimum, is your call to make and defend.

The property

Site plan: what covers the ground

Adelaide site planB1B2H1H2G1G2G3G4G5C1E1E2E3T1P1P2P3P4P5RL 100.0RL 100.917.5 m40 mStreetN0510 m
Key to adelaide site plan
IDFeatureArea or size
B1House · Building — double brick, tiled roof165 m² (roof 192 m²)
B2Garage · Building — boundary wall to the east, tiled roof30 m² (roof 36.7 m²)
H1Driveway · Hardstand — concrete, falls to the street101.4 m²
H2Pergola terrace · Hardstand — open vine pergola, no roof35 m²
G1Front garden · Growing zone — roses and shrubs; full sun95.2 m²
G2West border · Growing zone — narrow; afternoon sun18.6 m²
G3Vegetable beds · Growing zone — four raised beds in use26.2 m²
G4Orchard corner · Growing zone — lemon, almond, apricot40 m²
G5North bed · Growing zone — best aspect81.2 m²
C1Back lawn · Retained recreation — kept as lawn67.5 m²
T1Existing 5 kL tank · Tank — poly, 2011, garage roof, 0.4 kW pump to two garden taps5 kL
E1Lemon · Tree canopy — productivecanopy ≈ 3.8 m
E2Almond · Tree canopy — old, mostly deadcanopy ≈ 3.4 m
E3Apricot · Tree canopycanopy ≈ 3.6 m
P1Water meter
P2Electric storage hot-water unit
P3Switchboard and 5 kW solar inverter
P4Sewer connection (approximate) — drain assumed to leave the south-west cornerestimate
P5Stormwater to kerb
A1Vehicle access

Hatched: growing zone. Dotted: retained recreation. Dashed outline: roof edge or tree canopy. Cross-hatched strip: easement or exclusion zone. Triangles: estimated spot levels. Squares: service points.

Roof and catchment

Roof plan area is footprint plus eaves, plus any roof over hardstand. It is the area that collects rain, and it is not the same number as the footprint or the pitched roof surface. Only the shaded zones drain to storage today.

Adelaide roof zones and downpipesR1R2R3T117.5 m40 mStreetN0510 m
Key to adelaide roof zones and downpipes
IDRoof zonePlan areaDownpipesNow
R1House, north plane — to the street gutter96 m²2not connected
R2House, south plane — to the street gutter96 m²2not connected
R3Garage — the only zone on the 5 kL tank37 m²1to storage
T1Existing 5 kL tank — poly, 2011, garage roof, 0.4 kW pump to two garden taps5 kL

Shaded zones drain to storage now; dashed zones do not. Circles are downpipes. Areas are roof plan area, eaves included.

Floor plan

Enough to locate the wet areas, the fixtures a rainwater or greywater line would reach, and the services. Not a construction drawing.

Adelaide floor planBedroom 2Bedroom 3Bedroom 1HallLivingBathroomWCF8DiningKitchenQ1N11 m × 15 m
Rooms in adelaide floor plan
IDRoomArea
F1Bedroom 216.7 m²
F2Bedroom 315.8 m²
F3Bedroom 115.8 m²
F4Hall13.2 m²
F5Living24.2 m²
F6Bathroomwet area — shower and bath11.4 m²
F7WCwet area — cistern on the east external wall5.7 m²
F8Laundrywet area — tub and machine; external door east7 m²
F9Dining30 m²
F10Kitchenwet area — sink and dishwasher25 m²
Q1Laundry door

Shaded rooms are wet areas; the darker band is services. Internal walls are indicative.

Areas, and how they reconcile

QuantityFrom the planCase parameterNote
Plot700 m²700 m²the plan is the whole lot
Building footprint195 m²ground the buildings cover
Roof plan area228.7 m²230 m²within tolerance; 33.7 m² is eaves and roof over hardstand
Roof connected to storage now36.7 m²of 228.7 m² that has gutters
Designated growing area261.3 m²250 m²within tolerance
Retained recreation outside it67.5 m²not available to the design
Hardstand136.4 m²drives, paths, slabs
Other ground39.8 m²setbacks and narrow strips
course assumptionAreas computed from the plan geometry. Plans are drawn to round dimensions, so derived totals reproduce the case parameters within 15 m² or 4 %, whichever is larger.

Services and ground

Each fact is marked known when it comes from a document or a measurement at intake, estimate when it is someone's estimate, and to be measured when nobody knows yet. Nothing here is surveyed.

Slope
Falls about 0.9 m from the rear fence to the street, roughly 2 per cent, estimated from council contours. The back garden is the high end. estimate
Water
Mains, 20 mm meter at the front boundary. known
Sewer
Connected; the main is in the street. Where the house drain leaves has not been checked. estimate
Power
Overhead, 63 A single phase, with a 5 kW rooftop solar system. known
Gas
Natural gas for cooking. known
Stormwater
Roof and driveway to the street kerb. known

What is already there

Bills the household supplied

Water: four quarterly bills totalling 257 kL, at $3.60/kL usage charge plus a fixed supply charge. known

Electricity: twelve monthly totals for the whole house. No circuit is metered separately. known

January to MarchApril to JuneJuly to SeptemberOctober to December
75 kL56 kL55 kL71 kL
synthetic dataWater use from the last four quarterly bills. Bills cannot show what the garden used, or when within a quarter.

Case constraints

Rainwater may serve
toilet flushing, laundry, garden irrigation
It serves today
garden irrigation
Care available
up to 3 hours a week; nothing needed more often than every 2 days; everything survives 14 days unattended

What a design may change

The home is fixed. A design may add storage in the permitted zones (the published steps are 0, 5, 10, 15 kL), connect roof zones R1, R2 that have gutters but no connection, and cultivate up to 205 m² beyond the existing plantings. It may not build roof, buy land, or enlarge anything. The other decision variables are on the method page.

What nobody knows yet

16 facts above come from documents. These do not, and they are the starting point for your measurement programme: