Week 9 Set: Pipeline work session

Supervised set time to assemble the Slop Pipeline submission from the template, batching rule and schedule built in weeks 7 and 8

19 April 2027

No new material this week — the set is work time, timetabled around three fifteen-minute check-in slots (early, midpoint, last-call) rather than a single demo at the end, because a pipeline that looks finished at minute ten of a check-in and breaks under questioning is exactly the failure mode the teardown taught you to look for in other people’s work.

Bring

The week 7 pipeline diagram, the week 8 template with its slots filled five ways, the cull rule and threshold, the scheduling plan, and a first pass at the economics case: a cost-per-output figure (render minutes, API calls, whatever your archetype actually costs) set against a plausible return (ad revenue, lead generation, whatever your archetype is actually for). The check-ins exist to catch a pipeline that’s internally consistent but economically fictional — a template producing outputs nobody would pay for, at a cost nobody would recoup — before it’s what gets submitted.

Afterwards

Submit the Slop Pipeline. Week 10 assumes you now know what a system costs to run, and turns to a different problem: keeping one running for longer than a single batch without it drifting into something else.

The spec

What you bring to the session. Written so a reader can tell whether it has been met without asking you.