The 72-Hour Dispatch

The third rung — run the system hour by hour through the event, spend the storage, start the reserve, shed what you must, and record the cost.

Stage 3 of 4 · Weeks 7–10

Due
9 October 2026
Weight
25% of the course
Takes as input
a portfolio with a correlation profile
Produces
a dispatch log and a counterfactual

What you are producing

Two things. A dispatch log — what you did in each hour of the event and why — and a counterfactual: the same event run again with one decision changed.

What earlier work this uses

The portfolio from A2, and your A1 definition to bound the event. You are operating your own design, which is the point. A design nobody has operated is an assertion.

How the canonical definition constrains this

Duration is the constraint that bites. Storage sized in megawatts answers a different question from storage sized in megawatt-hours, and a multi-day event is where confusing the two becomes expensive — that is week 7. The recovery allowance matters here too: a brief return above the threshold is not a reset, and dispatching as though it were is a decision your log has to own.

What this feeds

Design for the Worst Week is where the dispatch log becomes evidence. Your final system has to answer what the dispatch exposed.

What counts as a defensible answer

A log that shows judgement under the information actually available at that hour, and a counterfactual that isolates one variable cleanly. Losing the event and understanding exactly where it was lost scores better than claiming a survival the log does not support.

The 72-hour dispatch console

Commit the reserve, choose a storage policy, then run it.

Dispatch stack against demand — % of installed capacity

Generation, storage, reserve and unserved demand across a 72-hour window, hour by hour. On the opening decisions the run loses supply from hour 38 onwards.

Energy left in storage — capacity-percent-hours

Stored energy remaining on the same time axis, plotted on its own scale because stored energy and hourly output are different measurements.

Take a decision
Storage policy
Outcome
lost
Shortfall from
h38
Unrecoverable at
h21
Unserved energy
359 %·h
Hours short
30

Synthetic scenario Synthetic trace: flat demand at 40% of capacity, storage rated 40% / 1050 %·h, reserve 24% with a 6-hour lead time, 6% demand reduction available. Generation is the shared teaching trace. No megawatt figure is claimed. This scenario is survivable — but not on the opening decisions.

The spec

The brief poses the problem and leaves room for a response. The spec is the fixed part: what a marker checks. Some lines can be checked mechanically; the rest call for judgement.

How it is marked

CriterionWeight
Quality of the hour-by-hour decisions40%
The counterfactual, and what it isolates35%
Honesty of the log about what was sacrificed25%