Skip to main content

Group Project

A team-built Space Science production line, taken from a shared starting save through to a self-sufficient rocket launch.

Due: 23 October 2026 · Weight: 30%

The brief

As a group, take a shared base from where Week 7 leaves it to a self-sufficient Space Science operation.

Groups form in Week 7 and inherit one save between them. Everything from that point — role allocation, which sub-system each member owns, how conflicting blueprint choices get resolved — is part of the assessment, not incidental to it. A base that works because one person did everything is not a passing group project, however good the base is.

What you submit

The shared save file at hand-in, a design report covering the production chain’s key ratios and the layout decisions that made them hold, and a short note from each member on what they built and what they relied on a teammate for.

The spec

The brief poses the problem and leaves room for a response. The spec is the fixed part: what a marker checks. Some lines can be checked mechanically; the rest call for judgement.

How it is marked

CriterionWeight
Base output and reliability50%
Design report30%
Collaboration evidence20%