The last 20 dB

Shielding a room is a purchase, not a decision. What does each additional 10 dB cost, and where on that curve does everyone who is not a government stop buying?

Why the emission is reconstructible

A display drives its image on a fixed schedule and repeats the frame sixty times a second. A receiver that knows the schedule can add the repeats together.

That is the whole reason this is a picture rather than a hiss: the signal is periodic and the noise is not.

What the target actually is

Attenuation is not measured against audibility. It is measured against how long an attacker is willing to sit outside.

Coherent averaging of N repeats buys back 10·log₁₀(N) dB. Sixty frames a second is the exchange rate.

The exchange rate, written out

AttenuationRepeats needed to undo itTime on a 60 Hz display
10 dB100.17 s
20 dB1001.7 s
40 dB10,0002.8 min
60 dB1,000,0004.6 hours
80 dB100,000,00019 days

The first two rows are free to the attacker. The defender pays for all five.

What each band costs to build

TargetWhat buys itWhere the leak has moved
20 dBconductive paint or foil on the wallsthe door
40 dBmesh through every wall, floor and ceilingventilation and cable entries
60 dBwaveguide vents, filtered mains, RF door gasketthe gasket’s maintenance schedule
80 dBwelded enclosure, isolated power, no penetrationsthe people who have to work inside it

Each row closes the dominant leak and promotes the next one.

The shape, not the total

Relative cost against attenuation target, flat from twenty to fifty decibels and then rising almost vertically between sixty and eighty

05010020406080attenuation target, dBcost, relative to the 20 dB buildlast 20 dB

The curve decides who pays

A build to 80 dB costs five times a build to 60 dB. The last 20 dB is four-fifths of the bill.

TEMPEST is still a government practice, not because the mechanism stayed secret — van Eck published in 1985 — but because nobody else was ever going to buy the right-hand end of the curve.

Before the Bench

Bring a stated attenuation target and the willingness to cost a room instead of capture one: mesh, seams, penetrations, door.

The Bench asks for a bill of materials and one sentence separating what the room costs from what the device costs. Compare curves with another pair afterwards — your totals will disagree and your shapes should not.